Cabin Remodeling Pictures

March 13, 2006


DSC_0015.JPG
Well work: putting in new piping after burying line to the basement.


DSC_0016.JPG
Cabin set down with beam still in.


DSC_0017.JPG
View from the lake: final cabin elevation.


DSC_0019.JPG
A more close-up view near the shore.


DSC_0023.JPG
Removing the small cross-beams from the basement. Temporary wall is visible behind the big I-beam.


DSC_0025.JPG
View of the temporary wall, framing, and micro-lam beam (top).


DSC_0028.JPG
Closer view of foundation and membrane. Pipe running along the bottom is drainage tile.


DSC_0029.JPG
Installing the pump and well casing.


DSC_0031.JPG
East side of cabin.


DSC_0033.JPG
View of the final elevation relative to the driveway.


DSC_0034.JPG
I-beam on the way out (left), and dump trucks on the way in to deliver fill.


DSC_0035.JPG
View of remaining snow in the woods-- probably still more than a foot.


DSC_0037.JPG
Backfill sand.


DSC_0038.JPG
Monty Janowiak removing the last I-beam..


DSC_0039.JPG
Randy Sutherland (the Deere master).


Beginning| Previous (Feb 4-27) | Next (Mar 20) |