Well work: putting in new piping after burying line to the basement.
Cabin set down with beam still in.
View from the lake: final cabin elevation.
A more close-up view near the shore.
Removing the small cross-beams from the basement. Temporary wall is visible behind the big I-beam.
View of the temporary wall, framing, and micro-lam beam (top).
Closer view of foundation and membrane. Pipe running along the bottom is drainage tile.
Installing the pump and well casing.
East side of cabin.
View of the final elevation relative to the driveway.
I-beam on the way out (left), and dump trucks on the way in to deliver fill.
View of remaining snow in the woods-- probably still more than a foot.
Backfill sand.
Monty Janowiak removing the last I-beam..
Randy Sutherland (the Deere master).