Cabin Construction Pictures

February 4-27, 2006


DSC_0002.JPG
In the basement, looking northeast (Feb. 13).


DSC_0003.JPG
Southwest corner (Feb. 13).


DSC_0004.JPG
Drop footing in northwest corner (Feb. 13).


DSC_0005.JPG
Outside (Feb. 15).


DSC_0006.JPG
Foam-insulated concrete forms (Feb. 16).


DSC_0007.JPG
Basement with plumbing roughed in (Feb. 15).


DSC_0008.JPG
Basement looking southeast (Feb. 15).


DSC_0009.JPG
Basement looking east (Feb. 15).


DSC_0010.JPG
Basement looking north (Feb. 15).


DSC_0011.JPG
Basement looking west (Feb. 15).


DSC_0014.JPG
Inspecting in-floor heating (Feb. 18).


DSC_0015.JPG
In-floor heating (Feb. 18).


DSC_0046.JPG
Feb. 27. Look who showed up to help!


DSC_0047.JPG
Beginning the pour (Feb. 27).


DSC_0049.JPG
First wheel barrel (Feb. 27).


DSC_0050.JPG
Don't let it splash on you (Feb. 27).


DSC_0052.JPG
Brian trawling (Feb. 27).


DSC_0053.JPG
Colorizing (Feb. 27).


DSC_0054.JPG
Mixing in colors (Feb. 27).


DSC_0012.JPG
Cured floor (Mar 4).


DSC_00111.JPG
Cured floor (Mar 4).