In the basement, looking northeast (Feb. 13).
Southwest corner (Feb. 13).
Drop footing in northwest corner (Feb. 13).
Outside (Feb. 15).
Foam-insulated concrete forms (Feb. 16).
Basement with plumbing roughed in (Feb. 15).
Basement looking southeast (Feb. 15).
Basement looking east (Feb. 15).
Basement looking north (Feb. 15).
Basement looking west (Feb. 15).
Inspecting in-floor heating (Feb. 18).
In-floor heating (Feb. 18).
Feb. 27. Look who showed up to help!
Beginning the pour (Feb. 27).
First wheel barrel (Feb. 27).
Don't let it splash on you (Feb. 27).
Brian trawling (Feb. 27).
Colorizing (Feb. 27).
Mixing in colors (Feb. 27).
Cured floor (Mar 4).
Cured floor (Mar 4).
Beginning | Previous (Feb 3) | Next (Mar 13) | Most recent (Mar 20)