View from the driveway (judge for yourself how it looks with six fewer trees).
Cabin level in these first four shots is about what it will be when construction is finished.
Friendly construction helper.
Backside, at approximate final level, immediately before the final two feet of lifting.
View of the rotted boards under the living room (needed reinforcement).
Last two feet of lifting.
Lifting is now complete.
Final leveling of the house.
View from about 100 yards out onto the lake.
The only window loss is the single pane that is missing from this picture (glass can probably be replaced).
Ben examining the lake side for damage.
Underside.
View into yard. Dirt path is added dirt for vehicles.
View of reinforcing floor joists.
Mileage on my speedometer upon returning to work.
Beginning Previous (Jan 30) | Next (Feb 03) | Most recent (Mar 20)